See Sample Report

Know what a design revision affects before you release it.

Upload the previous revision, new revision, BOM, and open POs. Get a concise impact report showing what changed, what may now be stale, and what needs human review.

No ERP or PLM integration required.

Engineering Change Impact ReportECO-0931
Drawing
B-10482
Revision
C → D
Top assy
2407-000
Files
4
  • HIGH
    Open PO references superseded partPO 44218 · P/N 10482 Rev C
  • HIGH
    BOM quantity mismatchBOM qty 2 · Rev D requires 3
  • REVIEW
    Mating component may be affected4× M8 → 6× M10 hole pattern
  • MEDIUM
    Material change may affect supplier sourcing304 SS → 316 SS
Illustrative exampleEvery finding cites its source file

01 The problem

A revision changed. What else changed with it?

A drawing update is rarely just a drawing update. The new revision gets released, and the BOM, the open POs, and the parts it mates with are still describing the old one.

Someone usually catches it. Sometimes it is receiving, after the wrong part arrives.

B-10482 Rev C → Rev Dmay affect
  • IDPart numbers
  • QTYQuantities
  • MATLMaterials
  • POOpen purchase orders
  • DWGRelated drawings
  • BOMBills of material
  • SUPPLIERSupplier commitments
  • WIWork instructions
  • MFGManufacturing assumptions

02 How it works

Three steps, starting from files you already export.

  1. STEP 01

    Upload the files you already have

    • Previous revision
    • New revision
    • BOM
    • Open PO export
  2. STEP 02

    Reconcile the change

    The system compares the two revisions, then checks the differences against the BOM and open POs to identify likely downstream impact: stale part numbers, quantity and material mismatches, and parts that interface with what moved.

  3. STEP 03

    Review the impact report

    Findings are grouped by severity. Each one cites the source file it came from, and anything the system cannot resolve with confidence is flagged for human review rather than guessed.

03 Example output

What the report looks like.

Findings, the evidence behind each one, and the action it calls for. Nothing else.

Open the full 2-page sample
Case Packer Assembly 2407 — Washdown UpgradeECO-0931
Drawing
B-10482
Revision
Rev C → Rev D
Top assembly
2407-000 Rev F
Inputs
2 DWG, BOM, PO

Rev D changes the product-guide bracket from 304 to 316 stainless, adds a third bracket per assembly, and changes the mounting pattern from 4× M8 to 6× M10.

Findings for B-10482 Rev C to Rev D
SeverityFindingEvidenceRecommended action
HIGH PO 44218 contains 24 units of P/N 10482 Rev C. Current drawing is Rev D. PO export + Drawing B-10482 Rev D Review supplier status before release
HIGH BOM lists quantity 2. Rev D drawing requires quantity 3. BOM + Rev D Update BOM before release
REVIEW Fastener pattern changed from 4× M8 to 6× M10. Mating plate may be affected. Drawing comparison Engineering review required
MEDIUM Material changed from 304 to 316 stainless. Open PO is priced for 304. Drawing comparison + PO export Confirm supplier can source 316 before release

Checked, no impactGuide rail 2407-110, side frame 2407-120, drive chain guard 2407-310

Illustrative example — fictional part numbers, POs and quantitiesPage 1 of 2

04 Fit

Built for messy files, not perfect systems.

Real engineering work spans CAD, PDFs, spreadsheets, ERP exports, and email. This is designed for that environment, not for the one in the implementation brochure.

Not required

  • PLM migration
  • ERP replacement
  • System integration to start

Works from

  • Drawing PDFs
  • BOM spreadsheets
  • ERP open PO exports

This is not a PLM or ERP replacement. It is a review step that sits in front of your release, using exported files.

05 Human review

Your engineers stay in control.

The system does not approve engineering changes. It identifies likely impacts, inconsistencies, and areas requiring attention. Your team makes the final decision.

01

Evidence-backed findings

Every finding names the source file and where in it the finding came from, so your team can check it directly.

02

Human review for uncertain cases

When a conclusion depends on engineering judgment, it is marked REVIEW and left for your team, not resolved by guesswork.

03

No hidden system changes

Nothing connects to your ERP, PLM, or CAD. The output is a report. What changes in your systems is up to you.

File handling

  • No system access required to start
  • Files are used only to prepare your report
  • NDA available before you send anything
  • Redact pricing or customer names as needed

06 Who it is for

For teams that design what they build.

  • ETOEngineer-to-order manufacturers
  • OEMCustom machinery builders
  • CMContract manufacturers
  • OEMIndustrial equipment OEMs
  • MFG ENGManufacturing engineering teams
  • SUPPLYProcurement teams supporting frequent design changes

IndustriesCustom machinery · Packaging equipment · Material handling · Conveyors · Process equipment · Industrial automation · Pumps and skids · Specialty machinery · Contract manufacturing

07 Start

Start with one real revision.

Send one change package and see what the system catches.

  • Old revision
  • New revision
  • BOM
  • Open POs
See a 2-page sample report

No integration. No implementation project. Just the files.

Run a revision

Tell us where to reply. We send an NDA and upload instructions by email. Don't attach files here.